Josh Farler Foundation

Table Build - Final Assembly

Article Index

 Final Assembly

 The last bit was to add the DVR.  Remember all of the wires hanging off the back?
28

 

We attaching a faceplate to the inside of the rear panel area (remember the large rectangular hole?) As you can see we colour coded each keystone to match the keystones on the table.  This way you just plug the green cat5 into the green plugs and so on.
29
Already outdated (see below)

 

With the keystone plate in place we have the following.  This area provides storage, during transport, for the DVR power, and the mouse. We changed to a simple wireless mouse that stores with the system.
30

 

The front view with everything stored inside.
33

 

And finally the finished product.  Notice the industrial looking screws we added to the top.  The bottom uses recessed screws that we then covered with plugs and sanded smooth.
34

35

 

2020 Final Table